Our thanks go to all those who gave so generously of their time
and resources and without whom this project may never have been
completed.
- Yacht Design
- Brian Betley,Design and Engineering
- Boat Building Shed
- William Hare Ltd
- Engine
- Perkins Sabre Ltd
- Propshaft Assembley
- AFS Rotel, Mr J Williams & Mr D Williams
- Rubber Mouldings
- Bolton Rubber Mouldings
- Castings
- Thomas Sandiford (Rochdale) Ltd
- Hydrostatics
- Rick Smith
- Cement
- Castle Cement,Stuart Pepper
- Ferro-cement Research
- UMIST, Mr P Nedwell
- Finishes
- Leigh's Paints,Mr B Leigh-Bramwell
- Local Newspaper
- Bolton Evening News, Julie Freer
- Local Television
- Look North West, Dave Guest
- Electrical wiring and installation
- Engineering Services, Mr. Joe Flannagan
- Surveyor
- Mr Tony Tucker, YDSA
- Hull Netting
- Brabbin and Rudd,Mr. Andy Brabbin
- Mast and Spars
- Sailspar Ltd
- Thrust Bearing
- Woodhey Engineering Ltd
- Lifting and Transportation
- Ainscough Vanguard Ltd, Mr Martin Ainscough
- Sail Emblem
- Grandoption Ltd, Mr D Plumbridge MD, Mr C Lloyd
- Safety Equipment
- Cullen Safety Ltd, Mr P Stavropolous